MECH-01 |
Air & Gas Compressors Principles of Operation |
5 |
29 Dec-02 Jan |
Cairo |
|
|
MECH-02 |
Air Conditioning |
5 |
05-09 Jan |
Cairo |
|
|
MECH-03 |
Air Conditioning & Refrigeration |
5 |
12-16 Jan |
Cairo |
|
|
MECH-04 |
Air Coolers & Ventilating Towers |
5 |
19-23 Jan |
Sharm El-Sheikh |
|
|
MECH-05 |
Air Production Package |
5 |
26-30 Jan |
Sharm El-Sheikh |
|
|
MECH-06 |
API Tank Inspection Code |
5 |
02-06 Feb |
Cairo |
|
|
MECH-07 |
Applied Combustion Technology |
5 |
09-13 Feb |
Hurghada |
|
|
MECH-08 |
Axial & Centrifugal Compressors |
5 |
15-20 Feb |
Cairo |
|
|
MECH-09 |
Basics & Components of Hydraulic Systems |
5 |
23-27 Feb |
Cairo |
|
|
MECH-10 |
CAD for Mechanical Drawing |
10 |
02-06 Mar |
Cairo |
|
|
MECH-100 |
The Layout of Piping Systems & Process Equipment |
5 |
09-13 Mar |
Cairo |
|
|
MECH-101 |
Troubleshooting Piping & Pipe Support Systems |
5 |
16-20 Mar |
Cairo |
|
|
MECH-102 |
Turbo Expander: Operation, Performance, Maintenance & Troubleshooting |
5 |
23-27 Mar |
Cairo | Oman |
|
|
MECH-103 |
Vibration Correction & Rotating Equipment Alignment Techniques |
5 |
30 Mar-03 Apr |
Cairo | Dubai |
|
|
MECH-104 |
Water System Networking & Pumping Stations |
5 |
06-10 Apr |
Cairo | Kuala Lumpur |
|
|
MECH-105 |
API 510: PRESSURE VESSEL INSPECTION CODE: Maintenance, Inspection, Rating, Repair and Alteration |
5 |
13-17 Apr |
Cairo| Istanbul |
|
|
MECH-106 |
API 580: Supplemental Knowledge of Risk Based Inspection |
5 |
20-24 Apr |
Cairo |
|
|
MECH-107 |
API 653: TANK INSPECTION CODE: Inspection, Repair of Steel Aboveground Storage used in Petrochemical |
5 |
04-08 May |
Cairo | Malaga |
|
|
MECH-108 |
API 936: Refractory Design, Installation, Inspection & Repair |
5 |
11-15 May |
Cairo |
|
|
MECH-109 |
API 936: Refractory Inspection Code: Installation, Inspection, Testing & Repair |
5 |
18-22 May |
Alex |
|
|
MECH-11 |
Control Valves & Orifice Plates Sizing, Calculations and Selection |
5 |
25-29 May |
Cairo |
|
|
MECH-110 |
API-580/581: Introduction To Risk Based Inspection Methodologies and Practices In Refineries, Gas, Oil & Petrochemical Facilities (RBI) |
5 |
01-05 Jun |
Aswan |
|
|
MECH-111 |
Basic Corrosion Techniques & Monitoring |
5 |
08-12 Jun |
Sharm El-Sheikh |
|
|
MECH-112 |
Boiler Failure Analysis |
5 |
15-19 Jun |
Cairo |
|
|
MECH-113 |
Cathodic Protection Systems: Design, Fabrication, Installation, Operation and Repair |
5 |
22- 26 Jun |
Cairo | Dubai |
|
|