| PPL-26 |
Maintenance & Troubleshooting of Gas Turbines |
5 |
28 Jun-02 July |
Cairo |
|
|
| PPL-27 |
Plant Startup & Troubleshooting |
5 |
05-09 July |
Cairo |
|
|
| PPL-28 |
Advanced GE Gas Turbine for Operators |
5 |
12-16 July |
Cairo | Oman |
|
|
| PPL-29 |
Start and Stop Gas Turbine While Handling Abnormal Conditions |
5 |
19-23 July |
Cairo |
|
|
| PPL-30 |
Fuel Control System and Load Variation |
5 |
26-30 July |
Cairo |
|
|
| PPL-31 |
GE Sequence of Operation |
5 |
02-06 Aug |
Cairo |
|
|
| PPL-32 |
GE Gas Turbine Control System using Speedtronics |
5 |
09-13 Aug |
Cairo |
|
|
| PPL-33 |
GE Gas Turbine Lubrication System, Oil Seals and Bearings |
5 |
16-20 Aug |
Cairo |
|
|
| PPL-34 |
Monitoring and Analysis of Important Readings in Gas Turbine |
5 |
23 - 27 Aug |
Cairo |
|
|
| PPL-35 |
Operation of Axial Air Compressor and Precaution to Prevent Surge |
5 |
30 Aug-03 Sept |
Cairo |
|
|
| PPL-36 |
Gas Turbine Inlet Air Treatment |
5 |
06-10 Sept |
Cairo |
|
|
| PPL-37 |
Gas Turbines Root Cause Failure Analysis |
5 |
13-17 Sept |
Cairo |
|
|
| PPL-38 |
Power Plant Gas Conditioning |
5 |
20-24 Sept |
Cairo | Malaga |
|
|
| PPL-39 |
HSE in Power Plant |
5 |
27 Sept-01 Oct |
Cairo |
|
|
| PPL-41 |
Speedtronics Control Panel HMI |
5 |
04-08 Oct |
Cairo |
|
|
| PPL-42 |
Air System in Gas Turbines |
5 |
11-15 Oct |
Cairo | Beirut |
|
|
| PPL-43 |
Diesel Engine in Power Plant |
5 |
18-22 Oct |
Cairo | Kuala Lumpur |
|
|
| PPL-44 |
Combustion with Dry Nox in Heavy Duty Gas Turbines |
5 |
25-29 Oct |
Hurghada |
|
|
| PPL-45 |
Compressors and Expanders in Gas Turbines for Engineers |
5 |
01-05 Nov |
Sharm El-Sheikh |
|
|
| PPL-46 |
Introduction to Combined Cycle Gas Turbines and Major Components |
5 |
08-12 Nov |
Cairo |
|
|
| PPL-47 |
Combined Cycle Abnormal Conditions |
5 |
15-19 Nov |
Cairo| Istanbul |
|
|
| PPL-48 |
GE Gas Turbine Design Philosophy |
5 |
22-26 Nov |
Cairo |
|
|
| PPL-49 |
Gas Heaters at Gas Conditioning Skid |
5 |
29 Nov-03 Dec |
Cairo |
|
|
| PPL-50 |
Gas Turbine Major Components Design & Construction |
5 |
06-10 Dec |
Cairo |
|
|
| PPL-51 |
Turbine Control Devices & IGV of GE Gas Turbine Units |
5 |
13-17 Dec |
Cairo |
|
|