WEL-160 |
PMCR Control Room Operation |
5 |
15-19 Jun |
Cairo |
|
|
WEL-161 |
Principals of Glycol Dehydration |
5 |
22- 26 Jun |
Cairo | Dubai |
|
|
WEL-162 |
Product Specification for Engineers |
5 |
29 Jun-03 July |
Cairo |
|
|
WEL-163 |
Production Process and Emergency Systems on Oil and Gas Installations |
5 |
06-10 July |
Cairo| Istanbul |
|
|
WEL-164 |
Pumps, Hydraulics, Separators’& Filters |
5 |
13-17 July |
Cairo |
|
|
WEL-165 |
Ratawi Production Operation |
5 |
20-24 July |
Cairo | Beirut |
|
|
WEL-166 |
Sensors and Measuring Instruments for Operators |
5 |
27-31 July |
Cairo| Istanbul |
|
|
WEL-167 |
Separation Equipment Selection & Sizing |
5 |
03-07 Aug |
Cairo |
|
|
WEL-168 |
Subsea Pipe Line Corrosion |
5 |
10-14 Aug |
Hurghada |
|
|
WEL-169 |
Subsea System |
5 |
17-21 Aug |
Cairo |
|
|
WEL-17 |
Drilling &formation damage |
5 |
24 - 28 Aug |
Cairo |
|
|
WEL-171 |
Well Inflow Optimization |
5 |
31 Aug-04 Sept |
Cairo | Kuala Lumpur |
|
|
WEL-172 |
X-Mas Tree & Wellhead Operations & Testing |
5 |
07-11 Sept |
Aswan |
|
|
WEL-173 |
Well Control Certification (IADC) |
5 |
14-18 Sept |
Alex |
|
|
WEL-174 |
Oil Wells Down Hole Safety Valves (Operations & Accessories) |
5 |
21-25 Sept |
Cairo | Dubai |
|
|
WEL-175 |
Well Integrity (Accountability & Responsibility) |
5 |
28 Sept-02 Oct |
Cairo | Oman |
|
|
WEL-176 |
Well Database Overview & Workshop |
5 |
05-09 Oct |
Cairo |
|
|
WEL-177 |
Gas Reservoir Management GRM |
5 |
12-16 Oct |
Sharm El-Sheikh |
|
|
WEL-178 |
Well Sharp Certification (IADC) |
5 |
19-23 Oct |
Cairo |
|
|
WEL-18 |
Well Control and Blowout Prevention |
5 |
26-30 Oct |
Aswan |
|
|
WEL-19 |
Well Stimulation Methods-Acidizing & Hydraulic Fracturing |
5 |
02-06 Nov |
Hurghada |
|
|
WEL-20 |
Drilling Engineering for Non-Drilling Engineers |
5 |
09-13 Nov |
Cairo| Istanbul |
|
|
WEL-21 |
Facies Analysis |
5 |
16-20 Nov |
Cairo | Beirut |
|
|
WEL-22 |
Sequence Stratigraphy |
5 |
23-27 Nov |
Cairo |
|
|
WEL-23 |
3D Seismic Course |
5 |
30 Nov-04 Dec |
Cairo |
|
|